The 100t Slag Pot Carrier designed and manufactured by Tolian rolled off the assembly line on 8th November 2016 in Qinhuangdao manufacturing base. This set of SPC will be exported to Korea and wok in Busan. As the first set of Tolian SPC enters into Korea, the 100t SPC will open the door for Tolian in Korean steel market.
Please refer to the SPC video in Project>Videos Show.