On 22nd of October, 2016, the 900t Launching Gantry and Tyre Trolley cooperated to finish the placing of first girder in Xinmin jobsite of Tongliao-Jingshen Highspeed railway.This section is under construction of FHEC of CCCC with a total length of 52.17km.