Live from jobsite: Shishou 1100t Bridge Erection Crane finished the last girder
Publication Date:2019-01-14
On 14th January of 2019, the Bridge Erection Crane (1100t) in China Shishou Yangtz River Bridge successfully finished the last pre-cast girder. After that, Tolian site team will start the disassembly of the crane.